Skip to content
TR

Ghent's design museum reopens built from city waste

Design Museum Gent's new wing has a facade of 82,000 lime-cured bricks made from local construction waste. Here is what opened and what to know before visiting.

By Cultvia Editorial2 min read
White brick building facade with deep horizontal shadows against a clear blue sky
Illustrative image · Photo: Sebastian Schuster / Unsplash

Design Museum Gent has reopened with a new wing that treats the city's demolition waste as building material. According to The Art Newspaper, the museum reopened on 3 October after a four-year, 20 million euro expansion and renovation that added a five-level wing called DING (Design in Gent) with about 2,000 square metres of flexible space for lectures, workshops and exhibitions.

What is the new building made of?

The facade uses more than 82,000 locally produced Gent Waste Bricks made from lime-cured municipal waste, The Art Newspaper reports. The Guardian's architecture review adds that each brick is 63 per cent construction waste sourced within 8 kilometres of the museum, pulverised and compressed with hydrated lime. That, it says, saves two-thirds of the embodied carbon of a regular fired clay brick, and the lime keeps absorbing carbon dioxide as it cures over coming months and years. The architects stress that this is a proof of concept rather than a cure for the climate crisis.

What else is there to see?

The museum has ten toilets, each designed with different sustainable materials: panelling made of seaweed in one, recycled household plastics in another, and floor tiles of volcanic ash in a third, according to The Art Newspaper. The Guardian notes that some carry QR codes for more information about their biomaterials. The reopening also includes a new presentation of the collection, which the museum's curator says should be more inspirational than didactic. The Guardian reports that the building is topped by a freely accessible public loft with views over the city, though it also records concerns about how its large white mass looks against Ghent's historic skyline.

Design Museum Gent at a glance
ItemDetail
Reopened3 October 2026
Cost20 million euros, four-year project
New wingDING, five levels, about 2,000 sq. m of flexible space
FacadeMore than 82,000 Gent Waste Bricks
Brick content63 per cent construction waste

For the visitor: what should you know?

The Guardian reports that visitors can take a brick home from the museum shop for 10 euros. Check the museum's official site for opening hours, ticket prices and the current exhibition programme before travelling. Anyone interested in buildings that reuse their surroundings may also like our report on OMA's coloured-glass courthouse in Lille, and the Pulse section has more architecture and exhibition news.

Why does it matter?

Most museum expansions announce their sustainability goals in brochures; this one built them into the walls. Whether the brick can be scaled elsewhere remains an open question, which even its architects say they are not claiming to answer, but the museum offers a visible, testable example.

Frequently asked questions

When did Design Museum Gent reopen?

The Art Newspaper reports that it reopened on 3 October 2026 after a four-year expansion and renovation.

What are the Gent Waste Bricks made of?

According to The Guardian, each is 63 per cent construction waste from within 8 kilometres, pressed with hydrated lime.

Cultvia Editorial

Editorial desk

Stories signed by the Cultvia editorial desk follow our editorial policy; every story lists its sources at the end and errors are fixed under our corrections policy.

#architecture#museum#Design Museum Gent

Last updated:

What changed?
  1. : First published

Sources

  1. From an indoor forest to a toilet made with seaweed: Design Museum Gent reopens after €20m eco-focused expansion — The Art Newspaper, 6 October 2026
  2. The CO2-absorbing building made of old sinks, windscreens and toilets: Ghent's £17m design museum is a green marvel — The Guardian, 20 October 2026
Was this helpful?
Report an error

Spotted wrong information, a calculation error or a technical problem? Tell us briefly and our editors will review and fix the page.

We store the page address and browser details with your report. Your email is only used to reply, is never shared and is deleted once the report is closed.

Up next

Gold mosaic detailArts & ExhibitionsV&A's Constantinople to Istanbul opens 7 Nov: tickets and highlights4 November 2026 · 1 min read
More from Pulse